Friday, April 8, 2011

Turn of the Century --Extended

In this story, one staircase begat another.  My staircase seen in the earlier blog, "Restoration Woodworking" was seen during a Summit Ave walking tour, and I was invited to take on this new project  --copy an existing  turn of the century staircase, as an exact replica and extending it into the newly developed attic space.


Here is a photo of the existing first floor entrance to the stairs.  It was a pretty swell house!


And here on the second floor, the the new stairs begin their extension into the attic space.  Of course, first we had to tear out the ceiling, while the clients were living there, with a child and expecting another.  Due date happened to correspond to our projected and hoped for completion date.  A little bit of "protection" was in order.


We contracted a millwork to cut the knives and mill matching trims and handrail.  A company we found on the internet copied our ballasters.
   



The converted attic completely matched the existing house, providing an additional bathroom, bedroom, study and family room.  


And basically, short of minor punch list stuff, we attained substantial completion by due date.

-Bill

Tuesday, April 5, 2011

kitchens

So, its been 6 years already, six years of exclusive, well, mostly exclusive, designing and installing kitchens, Ikea kitchens (those previous photos are all Ikea kitchens), combinations, variations and customized derivations of Ikea kitchens too--  a lot of kitchens.  You can do alot with Ikea's product.  Our company has been a certified installer of Ikea kitchens throughout the Twin Cities area--  has been until last September, when Ikea corporate decided for corporate reasons to unify activities with a nationwide installation service. 

Hey, it was a great run. 

I did install many a kitchen, honed my design skills,enjoyed many customers and learned the kitchen world inside and out-- tweeking, twisting and creating customized results with standardized off the shelf products.   I produced suburban woody kitchens, severe hipster kitchens, middle class family kitchens, compact bungalow efficiency kitchens, strictly functional office kitchens, as well as minimalist modernist, exclusively sophisticated "state of the art" euro-designer, Brad and Angelina looking kitchens.   Styles are languages, you have to use one to make art.

I'll show you what I mean in later posts.

-Bill

Monday, April 4, 2011


               kitchen
               



                                                         


                                                        
 







-Bill

Tuesday, March 22, 2011

Restoration Woodworking



Restoring this old staircase was quite a task.  Originally built in the 1890s on Summit Avenue in St Paul.  It was the front staircase linking 3 floors in a beautiful but throughly exhausted Victorian row house.   Having bore the ravages of American urban history, this opulent single family home had become a chopped up apartment house squalor.  And the staircase was a dilapidated rickety nightmare. 


Everything on this staircase had to be disassembled and rebuilt with new landings, new stringers  ...even the entry had to be moved back to its original location.


Few of the original parts are in their original location.  The staircase had been so cannibalized and butchered, that this present restoration is the product of a combination of stairparts, both original and salvaged from a second set of staircase parts saved from another unit in the set of row houses.  Of course, there were also a number of newly fabricated parts.  All the posts are new, with new moldings made to match.


I would guess that a good 80% of the parts that were used for this reconstruction are original to the 1890s row house, cut from the same trees and milled back in the day.  All the parts were refitted and installed in this revamped ensemble and,of course, newly refinished.



    -Bill

Thursday, March 10, 2011

Lake of the Isles Attic Build-out


Here are some shots of one of our favorite projects. It started with an unfinished attic space and some schematics from Rehkamp Larson Architects. The project included two bedrooms, a bath and an office. We also added several skylights and some built in cabinets. Everything went up two flights of stairs or as you can see, through the window!


After the project was complete, the clients were kind enough to provide letters of recommendation. Here are some excerpts:
"The project, begun in October of 2005 and completed in March of 2006, included the creation of two bedrooms, a bathroom, and an office.  It also involved complicated structural reinforcements, a small 3rd floor workspace, and elaborate trim detail, all completed from only rudimentary architectural drawings."
 Built in lighting
"... the work was done professionally, carefully, and up to high standards.  The finished space looks absolutely beautiful, and we have received no end of compliments and oohs and aahs."


"There was a minimum of disruption of our daily lives, and they were always courteous and easy to work with, including being warm and friendly with our kids and our dog." 


"Despite the fact that we had few concrete plans for exactly how the space was going to turn out, Bill worked with us to help us figure it out, and he was always flexible and adaptable."

"Most importantly, we always felt that they were entirely trustworthy—they worked hard, charged fairly, billed honestly, and dealt with us professionally.  We actually miss having him around!" 
 We miss them too.

Wednesday, February 2, 2011

Ultra Custom Ikea Galley Kitchen


 Doesn't look like an Ikea kitchen and  doesn't feel like an Ikea kitchen.  Its not to be found in the Ikea catalog, but....  well, give up?  it's half Ikea, and half not.
The boxes and the drawers and hardware are all from Ikea, but the doors, coverpanels, and drawer faces are all made by Scherr Cabinets www.scherrs.com/ in North Dakota.


The client wanted to use Ikea cabinets, but she didn't want to use their door styles.  She wanted a white oak, rift cut veneer doors with a vertical grain pattern which would  flow and continue through the individual doors.  Its a classic architectural look, and very beautiful too.


I would like to claim that I figured out how to have these doors manufactured, but the client already had found the supplier.  I just had to make sure everything fit.  It would have been pretty easy too, but, of course, in order to make these cabinets fit as envisioned, we had to do a bit of customizing of the boxes.  And then there was that smart idea of the long horizontal open box above the hood.  And then---   it was a great collaboration.  A gift that kept on giving.


Corian countertops and the best deal I ever heard of in an undermount sink from some online supplier.
My client has some resourceful skills.


 My client also found the pulls (handles) from Restoration Hardware.




And finally there is the radiator cover window seat, with a built in recycling drawer to complete the total design.


     Bill

Sunday, January 30, 2011

Minneapolis Bungalow

A sure sign of a successful project is when the clients call you back for phase two. I was the lead carpenter on a master suite addition for this south Minneapolis bungalow. That first phase reorganized the first floor layout, created a beautiful kitchen,  (w/ custom cabinets by Choice Wood) and a master suite on the second level.

5 years later they called me back to remodel the basement, the two remaining bathrooms and attend to a “laundry list” of other upgrades. When presented with the plan I suggested we add a heat recovery ventilator since we had tightened up the house considerably.

Here are a couple of shots of the finished product.   

Jeffrey 

 Kitchen


 Finished Basement



 Main Bath


Marble in the Laundry